Free Standards Online
AS 2758.0:2020 Aggregates and rock for engineering purposes Part 0: Glossary and general series information. 3.1.4 recycled aggregate aggregate derived from the processing of materials previously used in a product or from construction activities that would otherwise be sent to waste Note 1 to entry: Where recycled aggregates are to be used in construction, they should be subject to a separate works specification under the AS 2758 series. 3.1.5 single sized aggregate one sized aggregate aggregate in which at least 60 % (by mass) of the total material passes a sieve, which is immediately less than the nominal size of the aggregate and is retained on the sieve immediately following the selected sieve in the selected set Note I to entry: The typical sieve set used in Australia include sieves with the following aperture sizes: 75.0 mm, 53.0 mm, 37.5 mm, 26.5 mm, 19.0 mm, 13.2 mm, 9.50 mm, 6.70 mm, 4.75 mm, 2.36 mm, 0.600 mm and 0.075 mm. This selection of sieves is approximately a quarter series. 3.2 may indicates the existence of an option 3.3 nominal size designation of an aggregate that indicates the largest size particle present Note 1 to entry: The concept of nominal size of an aggregate is for convenience of reference and ordering and is summarized below: 3.8 sample increment amount of material for aggregates and sands taken directly from the conveyor, bin, truck or section of a stockpile, a placed layer in earthworks or a pavement layer amount of material for aggregates and sands collected in a single pass of a sampler head 3.9 shall indicates that a statement is mandatory 3.10 should indicates a recommendation 3.11 source rock in situ rock mass located in a quarry to be used in the production of crushed rock, aggregate or manufactured sand 3.12 supply agreement agreement between the aggregate supplier and a second party that details the test procedures and limits for aggregate supply Note 1 to entry: The agreement may detail sampling requirements and testing frequency. The agreement may be for a specific project or for regular, routine supply. 3.13 works specification body of documents detailing the construction requirements for a works project, which include specification and supply arrangements for materials, including materials specified in the AS 2758 series, delivered to or produced on site Note 1 to entry: This body of documents may include specifications in the AS 2758 series, references to...

Download Address

  • Download