Free Standards Online
BS IEC 63277-2021 Binary power generation systems with capacity less than 100 kW – Performance test methods. 4 Construction, power of binary power generation system 4.1 General construction of binary power generation system The binary power generation system consists of evaporator, expander, condenser,working fluid pump, and generator as shown in Figure 1 . A system in which a working fluid having a low boiling point is heated by the hot water and the expander is driven by the working fluid gas to generate electricity. The heat source is hot water and cooling source is cooling water. See Annex A for the informative specification for grid-connected inverter. 4.2 Net power (Sending-end output) / Gross power (Generating power) The sending-end output shall be the net power output of the system deducting the internal power consumed, such as the working fluid pump, grid-connected inverter, auxiliaries in the system from the gross power. And the gross power output shall be from the generator terminal. 5 Test condition 5.1 General test condition General test conditions from Test 1 to Test 6 are shown in Table 1 . Moreover, the tests provide a validation of nominal performance declared by the manufacturer datasheet (test condition 7). All the measured values of Y1 kW to Y6 kW shall be recorded, unless specifically required by the manufacturer. The generating power is measured with a combination of 6 temperature points. 5.2 Rated test condition 5.2.1 General The rated values (performance) shall be evaluated under the conditions of Test 1 in Table 1 , at hot water temperature of 90 °C ± 1 °C and cooling water temperature of 20 °C ± 1 °C. If the manufacturer defines the rated value under its own operating conditions other than the specified test conditions, the manufacturer shall specify the test conditions as shown in Test 7 of Table 1 , and evaluated as rated value. 5.2.2 Tolerance of the rated net power The measured rated net power shall be within ±1 0 % of rated net power stated in the specification brochure of the manufacturer. 5.3 Accuracy of instruments used for measurement 5.3.1 Thermometer The accuracy of a thermometer used for measurement shall be ± 0,1 °C. 5.3.2 Flowmeter The accuracy of a flowmeter used for measurement shall be ± 2 %. 5.3.3 Three-phase power meter The accuracy of a three-phase power meter used for measurement shall be ± 0,2 %. 5.3.4 Calibration...

Download Address

  • Download